Client SELB.

 

Nature of Project-

Construction of a 3G Pitch within the grounds of an existing High School.

 

Works Involved

  • Excavation of filled ground and levelling pitch area with stone.
  • Construction of a retaining wall with stone cladding finish.
  • Kerbing works along perimeter of pitch and paths.
  • Extensive drainage works to existing ground (naturally slow-draining clay soil).
  • Erection of ball stop fencing, gates and recess goal areas.
  • Laying of open porous bitmac to prepare surface for shock pad and 3G turf.